chore(deps): update alpine docker tag to v3.20 - autoclosed #145

Closed
Renovate Bot wants to merge 1 commits from renovate/alpine-3.x into dev

This PR contains the following updates:

Package Type Update Change
alpine final minor 3.16 -> 3.20

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | alpine | final | minor | `3.16` -> `3.20` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4zNzUuMiIsInVwZGF0ZWRJblZlciI6IjM3LjM3NS4yIiwidGFyZ2V0QnJhbmNoIjoiZGV2IiwibGFiZWxzIjpbXX0=-->
Renovate Bot added 1 commit 2024-05-24 07:00:30 +02:00
ci/woodpecker/push/build Pipeline was successful Details
ci/woodpecker/push/lint Pipeline failed Details
d20c1c4d45
chore(deps): update alpine docker tag to v3.20
Renovate Bot changed title from chore(deps): update alpine docker tag to v3.20 to chore(deps): update alpine docker tag to v3.20 - autoclosed 2024-05-24 14:09:27 +02:00
Renovate Bot closed this pull request 2024-05-24 14:09:27 +02:00
Some checks failed
ci/woodpecker/push/build Pipeline was successful
Required
Details
ci/woodpecker/push/lint Pipeline failed
Required
Details

Pull request closed

Sign in to join this conversation.
No reviewers
No Label
No Milestone
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: Chewing_Bever/site-backend#145
There is no content yet.